RELIABILITY IMPROVEMENT & ASSESSMENT STUDY FOR ELECTRICAL SYSTEM |
|
|
APPROACH PLAN |
|
|
STUDY OF EXISTING SYSTEMS |
|
|
a) Review of Engineering documents |
d) Test Reports |
|
b) Existing drawings |
e) Abnormal Occurrence Reports |
|
c) Documentation |
f) Post-Mortem analysis Reports |
|
VISIT TO SITE |
|
|
a) Visual / Physical Inspection |
b) Site Conditions |
|
TESTING |
|
a) Prepare check list for individual equipment |
|
b) Conduct the Tests |
|
c)
Submit test reports with recommendation for immediate implementation
for any remedial |
|
d)
Review Compatibility due to aging of, |
|
e) Review /Study the benefits of modernization if carried out |
|
f)
Equipments for Testing |
|
g) Rotating Machinery |
|
h) DC System |
|
i) Emergency System |
|
j) Electrical Safety Equipment |
|
HUMAN/EQUIPMENT SAFETY |
|
a) Review of Grounding, Earthing & Bonding of electrical Systems |
|
b) Defined path for return of fault current back to source |
|
c) Positive operation of ground fault relaying (by Testing) |
|
DESIGN ENGINEERING |
|
a)
Load flow short circuit studies |
|
b)
Relay setting-Relay Co-ordination |
|
c)
Generator Islanding-Load Shedding Scheme |