Given below is a list of DESIGN ENGINEERING where either of Consultancy services, Commissioning services, Electrical System Study, turnkey consultancy services were provided. |
| SR. NO. | CLIENT / SERVICES | TYPE OF JOB |
|
35.0 |
Gujarat Ambuja Cements Ltd., Nalagarh Unit |
Engineering Services for Cement Grinding Unit at Nalagarh The scope includes, a) Relay Setting and co-ordination for plant. b) Requirement of cable trays & quantity of steel. c) Preparation of single line diagram. d) Cable Engineering e) Review for Drawings f) Preparation of Drawings g) Lighting system design |
|
34.0 |
Ruby Mills Limited., Mumbai. |
Consultancy services for electrical distribution system for a new Textile Process House at Khopoli. This includes,
a) Preparation of Detail Single Line
Diagram, indicating protections, b) Preparation of purchase specifications. c) Detail Design Engineering for, i) Lighting system design. ii) Earthing system design. iii) Equipment layout drawings. iv) Cable tray / trench layout. v) Cable schedule and interconnection diagram. d) Preparation of drawings / documents for statutory approval. |
|
33.0 |
Gujarat Ambuja Cements Ltd., |
Engineering Services for Cement Plant at Rauri Project, Himachal Pradesh. This includes engineering for, a) Cable Engineering b) Earthing system design. c) Review of drawings d) Preparation of drawings e) Lighting system design
f) Relay Setting and Relay co-ordination for new
plant electrical system |
|
32.0 |
Madras Aluminium Co. Ltd. Salem |
Carrying out re-engineering of 2 Nos. 110 kV TNEB Line-1 and Line-2 protection relays with Areva make Micom P543 line management relay. |
|
31.0 |
Gujarat Ambuja Cements Ltd., Dadri, U.P. |
Engineering services for local control station. This includes engineering for, a) Location of Local Control stations near motors.
b) Location
of control junctions boxes (J. B.) of each floor of plant c) Location of local central JB at each building. d) Location of central JB at USS building. e) Control cables interconnection at USS building. i. Local control station at local JB. ii. Local JB to central JB plant building. iii. Central JB plant building to USS building. iv. USS building JB to MCC marshalling panel. f) Preparation of control cable schedule. |
|
30.0 |
Gujarat Ambuja Cements Ltd., Bhatapara Unit Line-2 Raipur, Chattisgarh. (Clinkerization Unit 2.5 MTpa) |
Engineering Services for Cement Plant at Bhatapara Project, Chhatisgarh. This includes engineering for, a) Cable Engineering b) Earthing System Design c) Review of drawings d) Preparation of drawings e) Lighting system design f) Relay
Setting and Relay co-ordination for |
|
29.0 |
Gujarat Ambuja Cement Ltd. Bhatapara, Raipur Chattisgarh. (Power Plant)
|
Engineering Services for Power Plant (15MW & 33MW) at Bhatapara, Chhatisgarh. This includes engineering for, a) Cable Engineering b) Earthing system Design c) Review of Vendor drawings d) Preparation of drawings e) Lighting system design
f) Relay Setting and Relay co-ordination for
|
|
28.0 |
GACL, Dadri, U.P. (Grinding Unit 1.25 MTpa) |
Engineering of Cement Grinding Unit at Dadri, Uttar Pradesh The scope includes, a) Short Circuit Study. b) Relay Setting and co-ordination. c) Cable Engineering. d) Requirement of
cable trays & quantity of e) Preparation of single line diagram. |
|---|---|---|
|
27.0 |
Indo Rama Synthetics (I) Ltd.,
|
Consultancy Services for detail engineering for replacement of 25 MVA Transformer with 50 MVA Transformer at our Plant Butibori, Nagpur. This includes,
a) Review the
specifications prepared by Indorama for 50 MVA
b) Preparation of
Transformer layout, foundation drawing, Soak pit c) Review and study the adequacy of existing system equipment. d) Design of protection system for 50 MVA transformer. |
|
26.0 |
The Associated Cement Companies Ltd. Kymore Cement Works, M.P. |
Re-designing of 132kV Switchyard System. This includes, a) Preparation of Detail Single Line Diagram. b) Preparation of procurement specification. c) Preparation of 132kV switchyard layout drawing. d) Tender analysis of vendor offers and vendor drawings.
e) Relay setting & Relay Co-ordination for
132kV switchyard |
|
25.0 |
The Associated Cement Companies Ltd. Kymore Cement Works, M.P.
|
Design Engineering Parallel operation of MPEB 33kV power with 25MW, TG-5.
This includes,
a) Review of protection for parallel operation. b) Review of existing synchronizing scheme. c) Prepare specification for new hardware. |
|
24.0 |
Hindalco Industries Ltd., Unit : Birla Copper, Dahej. |
Design, engineering modification in existing engineering drawings, schematic and control diagram for replacement of PPX relay to MICOM relay. |
|
23.0 |
Grasim Industries Ltd., |
Power System Design for the electrical system including :
a) Review and approval of detail single line diagram of
b)
Review and approval of hookup of new 30 MW TG set with c) Suggest scheme for load sharing with existing TG sets d) Suggest better alternative if any |
|
22.0 |
Emami Paper Mills Ltd., Balasore, Orissa. |
Review of detail design engineering of 1 x 15 MW Captive Power Plant Electrical System and 132 kV Switchyard. |
|
21.0 |
Gujarat Ambuja Cement Surat, Gujarat. (Grinding Unit 1.0 MTpa)
|
Power system study for electrical distribution system including : a) Short Circuit Study. b) Relay Setting and co-ordination. c) Cable Engineering. d) Requirement of cable trays & quantity of steel. e) Preparation of single line diagram. |
|
20.0 |
Gujarat Ambuja Cement Roorkee, Uttaranchal. (Grinding Unit 1.25 MTpa)
|
Power system study for electrical distribution system including : a) Short Circuit Study. b) Relay Setting and co-ordination. c) Cable Sizing. d) Requirement of cable trays & quantity of steel. e) Preparation of single line diagram. |
|
19.0 |
Gujarat Ambuja Cement Farakka West Bengal. (Grinding Unit 1.25 MTpa)
|
Power system study for electrical distribution system including : a) Short Circuit Study. b) Relay Setting and co-ordination. c) Cable Engineering. d) Requirement of cable trays & quantity of steel. e) Preparation of single line diagram |
|
18.0 |
Saudi Basic Industries |
Detail engineering for upgradation of existing UPS system for IT department. This includes,
a) Study / evaluate existing
UPS Power System network and suggest
b) Preparation of technical
specifications, drawings for the new
c) Preparation of drawings
for layout of equipment, cable tray layouts d) Preparation of specifications for engineering package. |
|
17.0 |
Atul Ltd., |
Detail engineering for modification required for hookup of 4 MW TG set. |
|
16.0 |
Hindustan
Petroleum Corp. Ltd., |
Detail engineering for modification of existing distribution system, replacement of M. V. switchgears, substation equipment layouts, modification of existing protection schemes etc. |
|
15.0 |
Hindustan
Lever Ltd., |
Preparation of detailed single line diagram of existing electrical system. |
|
14.0 |
Madras Aluminiun Co. Ltd. |
Detail engineering for retrofit of Numerical Protection Relays in place of electromechanical relays for Generator Protection and Generator Transformer Protection. This include the modification of existing protection schemes. |
|
13.0 |
Atul Ltd. |
Detail engineering for the modification of existing grid islanding scheme panels. |
|
12.0 |
The
Bombay Dyeing and Manufacturing Co. Ltd., |
Feasibility study to check the adequacy of existing 220 kV system equipment to take care of start up and running loads considering the existing load and additional load. |
|
11.0 |
Indo
Bharat Rayon Ltd., |
Rationalization of Electrical Power Distribution, Power Evacuation and Power System Studies. This includes: a) Rationalization of Electrical Power Distribution b) Detail Engineering of Power Evacuation for New 2 x 10.8 MW CPP c) Rationalization of Power Source Grounding System d)
Carryout Transient Stability Studies, Load
Flow Studies, Short Circuit e)
Design and Engineering of Grid Islanding
Scheme and Post |
|
10.0 |
Gujarat
Ambuja
Cement Ltd., |
Detail
engineering
and consultancy services for electrical system of |
|
9.0 |
Birla Copper Ltd., Dahej |
1 x 12.5 MW , 1 x 2.85 MW Co-generation Power Plant a) Complete Design and Detail Engineering Services
b)
Testing-commissioning of Power Plant
and its electrical system
|
|
8.0 |
Melco India Pvt.Ltd., |
2 x 210 MW, Panipat Thermal Power Plant Ash handling plant Electrical system review, Design and engineering |
|
7.0 |
Deepak Fertilizers & Petro |
DG Power Plant feasibility report Under suspension, awaiting MSEB's approval |
|
6.0 |
Thirumalai Chemicals Ltd., |
2 x 1000 kVA DG Power Plant Complete design and detail engineering services. |
|
5.0 |
Thirumalai Chemicals Sdn. Bhd., Malaysia Consultancy & Commissioning services |
Detail engineering and Testing Commissioning for 7MW T.G. Set.
|
|
4.0 |
Gujarat State Fertilizers & Consultancy & Commissioning Services |
a) Testing - Commissioning of Co-Generation plant with its i) Phase - I , 15MW T.G. Set. ii) Phase - I I , 25MW T.G. Set.
iii) Phase - I I I , 32+20MW
b) Review of design engineering & Testing - Commissioning of |
|
3.0 |
Grasim Industries
Ltd.,
Electrical System Studies and |
1 x 40MW Co-Generation Power Plant
a) Relay setting and Co-ordination of Power Plant & electrical b) Testing - Commissioning of power plant & its electrical system |
|
2.0 |
Birla Cellulosic,
Consultancy, Commissioning |
2 x 15MW Co-Generation Power Plant a) Detail design engineering. b) Site-erection supervision
c) Testing - Commissioning of power plant and its electrical |
| 1.0 |
Atul Ltd.,
Consultancy & Commissioning |
1 X 18MW Co-Generation Power Plant a) Complete design and detail engineering Services. b)
Testing - Commissioning of power plant & its electrical |
|
PROJECTS WITH PARTNERS BHAGWATI POWER PLANT CONSULTANTS |
||
|
1.0 |
Ambuja Cement Eastern Ltd. Turnkey Consultancy services Elect. + Mech. + Civil +Instrumentation with BPPC |
1 x 20MW Thermal Power Plant. a) Detail design engineering including i) Unit Sizing. ii) Hook up system design. iii) Grounding system design. |
|
2.0 |
Vikram Cement., with BPPC |
Feasibility Study for 2x20MW Thermal Power Plant. |
|
3.0 |
Eurotex Industries & Export Ltd., Kolhapur. Turnkey Consultancy services Elect. + Mech. + Civil + Instrumentation |
(1 x 3MW ) + ( 1 x 4MW ) D. G. power plant a) Detail engineering b) Site erection supervision c) Testing - Commissioning |
|
4.0 |
Gujarat Sidhee Cement Ltd., Turnkey Consultancy services Elect. + Mech. + Civil + Instrumentation with BPPC |
3 x 6 MW power plant. |
__________________________________________________________________________________________________________________________________