| Given below is a list of Power System Study Projects and related Scheme Engineering Jobs executed by us: |
| SR. NO. |
NAME OF THE COMPANY |
DETAILS OF JOB EXECUTED |
|
100.0 |
Indo Rama Synthetics (I) Ltd., Nagpur.
|
Consultancy Service for addition of 11 MW STG at Butibori, Nagpur. The scope includes, a. Preparation of Key Single Line Diagram. b. Short Circuit study. c. Load flow study. d. Transient stability study. e. Relay setting and Relay Co-ordination study. f. Unit Protection of 11 MW Generator. g. Grid Islanding and Load Shedding scheme. |
|
99.0 |
Jindal Steel & Power Ltd., Raigarh |
Our scope of work includes, a. Transient Stability Studies.
b. Detail engineering for Grid Islanding and Load
Shedding scheme (GIS-
d Technical Tender analysis of vendors
offer for Grid Islanding and Load e. Review of vendor drawings of GIS-LSS panel.
f. Preparing cable schedule and
interconnection diagram for GIS-LSS |
|
98.0 |
Ultratech Cement Ltd., Bhavnagar
|
Checking the feasibility of providing the black start power supply to new TPP through 2 x 6 MW DG set at existing cement plant. This includes,
a) Sizing the cables and the overhead lines,
interconnecting DG set end b) Sizing the transformer and its specification. c) Defining the grounding and earthing system. d) Designing the protection system for this black start link.
e) Checking the feasibility of switching IN
the largest motor on one DG |
|
97.0 |
Jindal Steel & Power Ltd., Raigarh |
Power System study for hookup of new EAF at proposed 220kV switchyard. a. Carry out Load flow study
b. Carry out Transient stability study to
calculate critical clearance time a) New 220 kV switchyard bus b) New 33 kV bus
c. Transient stability studies to identify
voltage profile during switching IN
d Transient stability study to check the
voltage profile during momentary |
|
96.0 |
Ultratech Cement Ltd., Bhavnagar |
Relay Setting and Relay Co-ordination study for 4 x 23 MW Power plant electrical distribution system, from 220 kV GEB incomer at power plant up to 415 V MCC Incoming feeders. This includes, a) Preparation of key single line diagram with Data compilation report. b) Short Circuit Study. c) Relay Setting and Relay Co-ordination. d) Working out unit protection settings for, i) Generators. ii) Power Distribution transformers. iii) Tie feeders. iv) 11 varieties HT Motors. v) 220 kV and 66 kV line. vi) 220 kV switchyard protection. vii) LT Motors capacity higher than 90 KW. viii) PCC and MCC incomers. |
|
95.0 |
Abu Dhabi Oil Refining Co. Takreer |
Our scope of work includes carrying out relay co-ordination study and provide relay setting schedule for electrical system of Abu Dhabi Oil Refinery Ruwais Sulphur Expansion Phase III project. |
|
94.0 |
BG Exploration and Production India Limited, Panna. |
Consultancy services for starting of zero flare Gas compressor for Panna field. The scope includes a. Preparation of wiring or control schematic drawings b. Relay setting and Motor starting study with soft starter. |
|
93.0 |
Gujarat Ambuja Cements Ltd., Bhatapara Unit. |
Consultancy services for Grid Islanding and Load shedding scheme for GACL, Bhatapara unit. This scope includes carrying out following activities. a. Transient stability studies. b. Engineering load shedding scheme. c. Engineering grid islanding scheme. d. Work out back-up under frequency load shedding block. e. Work out Grid Islanding scheme relay setting. f. Work out load shedding scheme back up under frequency relay setting. |
|
92.0 |
ACC Limited, Kymore. |
Our scope of work includes, carrying out power system studies for the electrical system. Our scope of work includes, a) Load flow studies. b) Transient stability studies. c) GIS and LSS settings. |
|
91.0 |
ACC Limited, Kymore |
Our scope of work includes carrying out relay setting and relay co-ordination for 132 kV switchyard, 2 x 25 MW CPP, cement plant, The scope includes, a) Short Circuit study. b) Relay co-ordination study. c) Work out unit protection settings. |
|
90.0 |
Indo Rama Synthetics (I) Ltd., Nagpur.
|
Consultancy Service for addition of 37.5 MW STG at Butibori, Nagpur. The scope includes,
a. Checking feasibility for addition of new 37.5 MW
STG and its power b. Conceptualizing the electrical system through Single Line Diagram. c. Feasibility study for Power evacuation route. d. Load Flow study. e. Checking Feasibility of Power evacuation of 37.5 MW power plant. f. Short circuit study. g. Sizing and rating of cables, power transformers, CT, PT Switchgears. h. Billing and metering system for Import / Export of power. i. Checking layout feasibility. j. Estimating the requirement of earthing system. k. Evaluating the requirement of control, protection system. |
|
89.0 |
Emami Paper Mills Ltd., Orissa |
Power System Study for existing electrical distribution system for parallel operation of two TG sets (15 MW + 5 MW) and flexibility of re-distribution. This includes, a) Short circuit study results considering parallel operation of Grid + 15 MW T.G. Set + 5MW T.G. Set
b) Load flow study results considering
parallel operation of Grid + 15 MW
c) Relay Setting and Relay Co-ordination
for parallel operation of Grid + |
|
88.0 |
Monnet Ispat & Energy Ltd., Raigarh |
Carrying out following Power System studies for their system. This includes, i) Load Flow Study. ii) Short Circuit Study. iii) Transient Stability study. iv) Transformer Sizing. v) Harmonics study. vi) Review of transformer protection. |
|
87.0 |
Essar Oil Ltd., Jamnagar |
Our scope of work involves, carrying out Analysis for failure of 33 kV Current Transformers at FCCU substation and providing recommendation. |
|
86.0 |
Essar Oil Ltd., Jamnagar |
Carrying out Transient Stability studies, our scope of work includes, a) To check the behavior / survival of Generators.
b) To calculate and provide revised under frequency
Load Shedding. |
|
85.0 |
Gujarat Fluora Chemicals Ltd, Dahej |
Consultancy services for improving electrical system reliability and stability. This includes, a) Review of basic design of electrical system. b) Review of protective system, protection scheme and control logics. c) Carry out Power System Studies i) Load Flow study. ii) Short Circuit Study. iii) Relay setting and Relay co-ordination study. iv) Unit protection settings for Motor and Generator Protection relays
d) Integration of new 11kV, 18 MW power
plant and existing 11kV
e) Protection system design for continuous
parallel operation of existing f) Transient Stability studies. g) Engineering of Grid Islanding scheme h) Engineering of Load Shedding scheme. |
|
84.0 |
Associated Cement Cos.Ltd. Wadi Cement Works, Karnatka. (CPP) |
Relay co-ordination study for Existing plant, New plant and Captive power plant of ACC Wadi of 3 x 25 MW generation. This includes, i) Preparation of Single Line Diagram. ii) Carrying out Short Circuit Study. iii) Carrying out Relay setting and co-ordination study. |
|
83.0 |
Deepak Fertilizers and Petrochemicals Corp. Ltd. Taloja |
a) Electrical system studies This includes, i) Load Flow Study ii) Short Circuit Study. iii) Motor starting iii) Load Flow study with new system additions. iv) Feasibility of system for various option. b) Grid Islanding and Load Shedding scheme. i) Transient Stability studies ii) Prepare GIS scheme iii) Prepare LSS scheme with both MW based and frequency based. iv) Prepare specification of GIS and LSS scheme equipments. v) Relay settings of various protective relays used for GIS and LSS. |
|
82.0 |
Jindal Steel and Power Ltd. Raigarh (Chattisgarh) |
Power system design engineering at Raigarh, Chattisgarh. This includes, a) Preparation of Key Single Line Diagram b) Carrying out Short Circuit Study. c) Relay setting and Relay Co-ordination |
|
81.0 |
Indo Rama Synthetics (I) Ltd., Nagpur.
|
Consultancy Service for Relay Setting, Relay Co-ordination and Grid Islanding & Load Shedding Scheme engineering for 2 x 15.0 MW Captive Co-generation Thermal Power Plant, 3 x 13.5 MW + 3 x 4 MW DG Power Plants and Grid System at our Plant Butibori, Nagpur. The scope includes,
a) Relay Setting and Relay Co-ordination
study for electrical distribution i. Short Circuit study. ii. Protection Review. iii. Relay Setting and Relay Co-ordination. iv. Working out Unit Protection Settings. b) Grid Islanding and Load Shedding Scheme. i. Load flow study. ii. Transient stability study. iii. Engineering of Grid Islanding and Load Shedding Scheme.
iv. Working out Relay setting for
Grid islanding and Load Shedding |
|
80.0 |
Jindal Steel and Power Ltd., Raigarh
|
Relay Setting and Relay Co-ordination study for RUBM plant and 148” Plate Mill plant electrical distribution system. This includes, a) Short Circuit Study. b) Relay Co-ordination study. c) Working out Unit Protection Settings. |
|
79.0 |
BG Exploration and Production India Limited., |
Relay
Setting and Co-ordination study for electrical system of Panna Platform
including. a)
Short Circuit Study. b) Relay Setting and Co-ordination study |
|
78.0 |
Jindal Steel and Power Ltd., Raigarh |
Study of dynamic switching of HT Motors. |
|
77.0 |
ESSAR STEEL LTD., Vishakhapatnam
|
Study of Capacitor banks & Unit Protections,
a) Carrying out Load Flow Studies for sizing
of Capacitor banks and b) Working out Unit Protection Settings for HT and LT motors. |
|
76.0 |
Jindal Steel and Power Ltd., Raigarh
|
Feasibility Study of Power evacuation from 4 x 135 MW Captive Power Plant at Dongamohua, Tamara, Dist : Raigarh. This includes,
a)
Feasibility Study for evacuation
of power from 4 x 135 MW Captive
b) Load flow study & Short circuit
study for Option-1, i.e. for 4 x 135 MW
c)
Load flow study & Short circuit
study for Option-2, i.e. for 4 x 135 MW |
|
75.0 |
Jindal Steel and Power Ltd. Raigarh, Chattisgarh |
Power System Study for the electrical system including : a. Load flow study b. Short circuit study c. Transient stability study in case of i. Tripping of 220kV incoming CSEB lines at JSPL. ii. Tripping of 250MW TG set at JPL. d. Engineering an islanding scheme. e. Engineering a load shedding scheme under following conditions i. Tripping of 220kV CSEB lines at JSPL. ii. Tripping of 250MW set at JPL.
f. Working out the settings for islanding
relays and the load shedding blocks, i. Tripping of 220kV CSEB lines at JSPL. ii. Tripping of 250MW set at JPL. g. Working out over current and earth fault relay settings for, i. 220kV line from JPL to OPJIP. ii. 220kV line from OPJIP to JSPL.
iii. 220kV
interconnection, i.e. power evacuation route from receipt of JPL iv. JSPL TG sets power evacuation route up to 220kV bus. h. Working out voltage and frequency relay settings for following, i. 220kV line from JPL to OPJIP. ii. 220kV line from OPJIP to JSPL.
iii. 220kV
interconnection, i.e. power evacuation route from receipt of JPL iv. JSPL TG sets power evacuation route up to 220kV bus. |
|
74.0 |
PT Indorama Tbk (Polyester). Indonesia |
a) Power system studies. This includes, i) Load Flow Study ii) Short Circuit Study.
iii) Fault
investigation and disturbance analysis for a cable fault of iv) Power supply distribution and modification. b) Relay setting and co-ordination study |
|
73.0 |
Essar Steel Ltd. Vizag. |
Power system design engineering at Vizag (A.P.). This includes, carrying out
a) Load Flow Studies for
sizing of capacitor banks and identifying b) Working out Unit Protection settings for HT and LT motors. |
|
72.0 |
PT. Indorama Synthetics Tbk, Polyester Division, Indonesia. |
Deputation of Sr. Executive to site occurrence analysis. This includes carrying out data collection, review, analysis and investigation and submission of detail analysis report. |
|
71.0 |
GRASIM INDUSTRIES LTD, (CHEMICAL DIVISION.), Nagda |
Power System Study for the electrical system including : a) Load Flow Study b) Short Circuit Study c) Relay Setting and Relay Co-ordination Study |
|
70.0 |
Jindal Stainless Ltd. Jajpur, Orissa
|
Power System Study for the electrical system including :
a. Prepare and submit key single line diagram (220 kV) relevant to the
i. Augmentation of existing yard keeping the 220 kV switchyard at the
ii. Construction of new 220 kV switchyard at suitable location.
b. Carry
out the load flow study to identify the basic rating of the equipments
c. Work
out Voltage & Frequency profile at load centers for the two options
i. Steady state condition & ii. Dynamic condition of the load.
d.
Carry out Short circuit study for three phase faults and phase to
earth e. Define basic rating of the major equipments such as : i. Transformers ii. Cables
f. Examine
suitability of equipments already in service from view point of g. Stability studies to be carried out for following conditions:
i. Load flow studies for different grid and
captive generators operating
ii. The effect of dynamic loads of SAF, EAF and rolling mills on the grid
iii. The
operations of the plant with / without GRID and with different
h. Carrying
out following power system studies to develop the application of
i. Transient stability study.
ii. Study
to evaluate critical clearance time for fault at 220 kV Gridco Bus,
i.
Engineer a Grid islanding scheme for isolating the in-house Captive
j.
Engineer a Load Shedding Scheme, to ensure the survival of CPP on
k. Prepare
and submit, purchase specification for GIS and LSS panel. l. Review of vendor drawings for GIS and LSS panel
m. Relay setting for GIS
and LSS scheme relays and relay setting and
|
|
69.0 |
Kamal Engineering Consultants, Dubai. |
Carrying out Relay Setting, Relay Co-ordination and harmonic analysis for District Cooling plant project. |
|
68.0 |
CAIRNS ENERGY INDIA
PTY LIMITED, |
Restricted Neutral Earthing study. This includes, a) Design the Grounding arrangement for 415Vsystem.
b) Review of existing electrical equipment
in the electrical system for
c) Define the design parameters and detailed
technical specifications for
d) Design of protective relaying system with
specification of equipment such e) Relay Setting and Relay Co-ordination for existing protective relays. |
|
67.0 |
JINDAL STEEL & POWER LTD., Raigarh |
Study of dynamic switching of HT Motors. |
|
66.0 |
CHEMAF S.P.R.L., (Republic of Congo), |
Feasibility study of Load Flow, Short Circuit and Relay Co-ordination of existing Plant electrical distribution system and upgrading the same with upcoming new requirements / projects. |
|
65.0 |
ACC Limited. Kymore Cement Works, M.P.
|
Power System Study for the electrical system including :
a) Relay Setting, Relay
Co-ordination and Unit Protection settings of New
b) Review of synchronizing
scheme of New 25 MW captive power plant and c) Relay Setting for the emergency Power supply to NEW 25 MW CPP.
d) Review of Grounding
system of old CPP, existing 25 MW CPP, new
e) Relay Setting and Relay
Co-ordination of entire electrical system with f) Study of lightning arrestor installation throughout plant. g) Design of Load Shedding Scheme. |
|
64.0 |
Essar Steel Limited, Vishakhapatnam |
Power System Study for the electrical system including :
a) Short circuit study.
b) Relay Co-ordination study. c) Unit protection relay settings for Generators, Transformers and Motors of
d) Grid Islanding Scheme (GIS) and Load Shedding Scheme (LSS). This
i. Transient stability study.
ii. Study to evaluate critical clearance time for fault at 132
kV APSEB iii. Load flow study.
iv. Engineering Grid Islanding Scheme. v. Engineering Load Shedding Scheme. |
|
63.0 |
Ambuja Cement Ltd. Chattisgarh. (CPP) |
Rationalization of Power System (Neutral Grounding) at Bhatapara. |
|
62.0 |
Sterlite Industries (I) Ltd., Tuticorin, Tamil Nadu |
Load flow study involving Generator and generator transformer vis-ŕ-vis power evacuation to specify the basic parameters of generator transformer. |
|
61.0 |
PT Indorama Synthetics Tbk, Indonesia |
Power System Study for the electrical system including : a)
Short circuit study. b) Relay Setting and Co-ordination of 2 X 30 MW Power Plant. c) Unit protection settings d) Transient Stability Studies.
e) Design Engineering of
Grid Islanding Scheme (GIS) and Load Shedding |
|
60.0 |
Emami Paper Mills Ltd.,
Balasore, Orissa |
Power
System Study for the electrical system including : a)
Load flow, stability and motor starting study. b)
Short circuit and Relay Co-ordination study. c)
Unit protection relay settings for Generators, Transformers and HT
d)
Design, engineering of Grid Islanding (GIS), Load Shedding (LIS) |
|
59.0 |
Harihar Polyfibres Ltd., |
Power
system study for electrical distribution system including : a)
Load Flow Study b)
Short Circuit Study.
c)
Relay Setting and co-ordination.
d)
Transient stability study.
e) Design of PLC based Grid Islanding, Load Shedding scheme and |
|
58.0 |
Essar Oil Ltd., |
Power System Study for the
electrical system including :
a) Basic Engineering of
Grid Islanding and Load Shedding Scheme for
b) Engineering a Load
Shedding Scheme to operate after successful Grid c) Prepare and Submit purchase specification for GIS and LSS panel.
d) Technical scrutinies of
offers received from vendors and submit
e) Carry out Transient
Stability Studies to evaluate Critical Clearing Time f) Review of Vendor drawings for GIS and LSS panel. g) Relay setting for GIS and LSS scheme relay. |
|
57.0 |
Indian Farmers Fertiliser Copoperative Ltd., Paradeep Unit, |
Study of Existing system control scheme for Tripping of Generator Breakers & Turbine under various conditions of Fault. |
|
56.0 |
The Associated Cement Kymore Cement Works, M.P. |
Relay
Co-ordination Study for 8 MVA Transformer and Quarry Electrical System
including, a) Preparation of Key single line drawings indicating the protection system. b)
Short circuit study and Relay Setting Co-ordination. c)
Identifying lacunas in existing protection system and d) Unit Protection Setting. |
|
55.0 |
BG Exploration and Production
India Limited.,} |
Relay
Setting and Co-ordination study for electrical system of Tapti Platform
including. a)
Short Circuit Study. b)
Relay Setting and Co-ordination. c) Unit Protection Settings. |
|
54.0 |
Jindal Steel & Power Ltd. Raigarh |
Carrying out Load flow study of 220 KV network of JSPL, JPL, CSEB for Power evacuation for IX250 MW power plant at JPL through 220 KV network. |
|
53.0 |
ACC, |
Power system study for electrical distribution system including :
a)
Short Circuit
Study. b)
Relay Setting
and co-ordination.
c) Unit Protection. |
|
52.0 |
Ultra Tech,
|
Power system study for old STG + GTG electrical distribution system including :
a)
Short Circuit
Study. b)
Relay Setting
and co-ordination.
c)
Transient stability study.
d) Design
of PLC based Grid Islanding, Load Shedding
scheme |
|
51.0 |
Hindustan Lever Ltd., Sewri (Mumbai) |
Power system study for electrical distribution system including : a) Short Circuit Study. b) Relay Setting and co-ordination. c) Unit protection for transformer. |
|
50.0 |
Joint Operations, |
Power system study for 3.3kV, 11kV and downstream distribution system of Joint operation, Wafra including : a) Load Flow Studies b) Short Circuit Study. c) Relay Setting and co-ordination. d) Transmission Line Sag Calculation. |
|
49.0 |
Kuwait National Petroleum Co., Kuwait, through House of Trade Co. |
Power
system study for electrical distribution system of 3Nos. Frequency
Converter Units, 13.8kV, 2.4kV and 480V distribution system at Mina
Abdulla Refinery a) Short Circuit Study. b) Relay setting and co-ordination. c)
Unit protection
settings for Synchronous Motor, Synchronous |
|
48.0 |
IPCL |
Power system study for electrical distribution system for 6.6kV switchgear replacement including : a) Relay setting and co-ordination. b) Unit protection for Motors. |
|
47.0 |
Gujarat Ambuja Cement |
Power system study for electrical distribution system including : a) Short Circuit Study. b) Relay Setting and co-ordination. c) Unit protections for transformer, motor. |
|
46.0 |
Joint
Operations - through Heavy Co. |
Power system study for 34.5kV, 4.16kV and 0.48kV distribution system including : a) Short Circuit Study. b) Relay Setting and co-ordination. c) Unit protections for transformer, H.T. Motors. |
|
45.0 |
Hindustan Lever Ltd., Sumerpur |
Power system study for electrical distribution including : a) Short Circuit Study. b) Relay Setting and co-ordination. c) Unit protections for transformer, generator. |
|
44.0 |
Sterlite Industries Ltd., Tuticorin |
Power system study for electrical distribution including : a) Short Circuit Study. b) Relay Setting and co-ordination. c) Unit protections for generators, transformers. |
|
43.0 |
Madras Aluminium Company Ltd., Mettur |
Power system study for electrical distribution system based on enhanced generating capacity, this includes: a) Transient stability study of the electrical system b) Fault level calculation study, from 110kV up to MCC c) Relay setting and relay co-ordination from 110kV up to MCC d) Unit Protection for Generators, Transformers. e) Study of electrical interlocks for plant electrical system. f) Review battery banks capacity and D.C. distribution system.
g) Review
of earthing and grounding system emergency power |
|
42.0 |
Hindalco Industries Ltd., Dahej |
Feasibility Study for Islanded Operation of 60 MW TG set |
|
41.0 |
Grasim Industries Ltd., Nagda |
Study
of effect on
entire electrical distribution system
due to additional 5.515 MW TG set including,
a)
Short Circuit Studies
b) Relay setting and co-ordination
c)
Unit Protection for Generators, Transformers
|
|
40.0 |
Hindalco Industries Ltd., Dahej |
Power System Study
for electrical distribution system of |
|
39.0 |
Hindalco Industries Ltd., Dahej |
Feasibility Study for starting of 3 Nos 7.75 MW motors |
|
38.0 |
Hindalco industries Ltd., Dahej |
Feasibility Study for starting of 2 Nos 4 MW motors |
|
37.0 |
Oswal
Chemicals and Fertilizers Limited, |
Working out Motor Protection Relay Settings for 6.6 kV Motors |
|
36.0 |
Hindustan Lever Ltd., Daman |
Power System Study for electrical distribution system including a) Short Circuit Studies b) Relay setting and co-ordination |
|
35.0 |
Hindalco industries Ltd., Dahej |
Detail
engineering for hookup of Oxygen plant electrical system
with
existing MRSS system.
|
|
34.0 |
Hindustan Lever Limited, Nashik |
Power System Study for electrical distribution system including : a) Short Circuit Studies b) Relay setting and co-ordination c) Unit Protection Studies. |
|
33.0 |
Hindustan Lever Limited, Andheri, Mumbai |
Power System Study for electrical distribution system including : a) Short Circuit Studies b) Relay setting and co-ordination c) Unit Protection Studies. |
|
32.0 |
The Associated Cement Companies Ltd., Jamul Cement Works, Chattisgarh. |
Power System Study
for electrical distribution system including :
c)
Work out Unit Protection Settings of Transformer,
HT Motors, |
|
31.0 |
The Associated Cement Companies Ltd., Keymore Cement Works M.P |
Power System Study
for electrical distribution system including :
c)
Work out Unit Protection Settings of Transformer,
HT Motors, |
|
30.0 |
Hindustan
Lever Limited,
Andheri - Mumbai
|
a)
Preparation of detail Single Line Diagram of 11kV and 415 V
|
|
29.0 |
Schenectady Herdillia Limited, Navi Mumbai |
Electrical
System study of entire electrical distribution system including |
|
28.0 |
Ambuja Cement Eastern Limited, Rawan, Chattisgarh. (CPP) |
Electrical
System study of entire electrical distribution system including |
|
27.0 |
The Associated Cement Cos. Limited, Madukarai Cement Works, Coimbatore. (CPP) |
Electrical
System study of entire electrical distribution system including |
|
26.0 |
ESSAR Steel Limited, Hazira |
System study of electrical system
of HBI Plant, including: |
|
25.0 |
Steel Authority Of India Limited, Rourkela |
Electrical
System study of entire electrical distribution system including h) Auto Changeover Scheme i) Mesh Distribution System j) Review of Neutral Grounding and Protection System |
|
24.0 |
Ruchi Soya Industries Ltd., Indore |
Feasibility study for 7.5 MW co-generation power plant. |
|
23.0 |
Atul Ltd., Valsad |
Electrical System study of entire electrical distribution system including a) Relay setting, Relay co-ordination of existing system.
b)
Modifications of Grid Islanding and
Load shedding scheme |
Update : 12.05.10