1.0 |
Reliance Infocomm
Infrastructure Pvt. Ltd., Navi Mumbai. |
System and Operational Philosophy Audit at DAKC, for Phase-1 and Phase-2.
Phase-1 includes, a) Power and Load distribution. b) Operating philosophy. c) Control Philosophy for the HT System if any. d) Diesel Generator, Auxiliary power supply arrangement and requirement. e) Electrical equipment grounding. f) Capacity of existing DG sets.
Phase-2 includes,
a) Review of protection system, selection, application and
installation, suggest
b) Working out short circuit study and revise Relay Setting, Relay
Co-ordination |