Home
                     

Home

Company Profile services Infrastructure Experience Enquiry Vacant Positions Online Resume Submission

REFERENCE LIST :  RELIABILITY IMPROVEMENT STUDIES                  


Back

  

SR. NO.

CLIENT / SERVICES

TYPE OF JOB

1.0

Reliance Infocomm Infrastructure Pvt. Ltd.,
Navi Mumbai.

System and Operational Philosophy Audit at DAKC, for Phase-1 and Phase-2.

 

Phase-1 includes,

a)     Power and Load distribution.

b)     Operating philosophy.

c)     Control Philosophy for the HT System if any.

d)     Diesel Generator, Auxiliary power supply arrangement and requirement.

e)     Electrical equipment grounding.

f)      Capacity of existing DG sets.

 

Phase-2 includes,

a)     Review of protection system, selection, application and installation, suggest
        modification, addition, deletion wherever required.

b)     Working out short circuit study and revise Relay Setting, Relay Co-ordination
        under two different operating conditions of grid power and in-house DG set power.

TOP


                                                                                                                                     Update : 11.04.08