Home
                     

Home

Company Profile services Infrastructure Experience Enquiry Vacant Positions Online Resume Submission

EDP Facilities:
The majority of engineering is carried out on versatile softwares, ETAP. These software programmes are operational for long years and tried out on various projects with high accuracy output. An extensive computer installation with complete hardware is existing, to support day to day activities. LAN connected computer systems are available with 40 nodes and 10 printers, including a team of professional computer operators to carry out the activities efficiently.

MIS :
Complete Management Information System is handled by software programmes in various areas of operation such as.*Account software  *Payroll Programme  *Reception Control Programme  *
Octroi Control Programme  *Library Programme  *Vendor Evaluation Programme *Testing Instruments Inventory Programme  *Test Report Programme


Reception Area


Staff Area

Testing Facilities :
A specialised Commissioning group of engineers is available in-house to ensure smooth Testing-Commissioning of projects. This group of engineers has obtained a very specific field experience of commissioning of Power plants, EHV Switchyards and HT / LT Electrical Distribution System. This commissioning group is fully equipped with required testing instruments and varieties of accessories. These instruments are calibrated as per ISO standard procedures.
List of testing instruments for Testing-Commissioning projects

Condition Monitoring & Diagnostic Testing :
A specialised Condition monitoring & Diagnostic testing group of engineers is available in-house to ensure smooth, safe and high accuracy testing. This group of engineers has obtained a very specific field experience of carrying out various condition monitoring testing, diagnostic testing and trouble shooting of various rating of machines/equipment.
This Condition monitoring group is also fully equipped with required high accuracy class testing instruments and varieties of accessories. We have  not restricted ourselves for any make and size of machines testing. 

Stator of H T Machine

List of testing instruments for Condition Monitoring & Diagnostic testing

Customer expectation and our facility :
Major tests under condition monitoring are carried out by the PC control/ fully automated test sets. The aim is to reduce the testing time in specified shutdown period and to avoid the operator error. Supporting to this the advance software has features like data collection, graphical presentation of measured parameters and comparative study with respect to historical data available. Analysis gives guideline for next action. The object will be tested as per the procedure and test values as define by the IEEE, IEC and IS standards.

TOP