| SR. NO. | NAME OF THE COMPANY / REPEAT ORDERS RECEIVED | SERVICES OFFERED | DETAILS OF JOB EXECUTED |
| 13. | Madras Aluminium Company
Ltd., Mettur - Tamilnadu 2005 |
Troubleshooting, Testing and Re - Commissioning and Rectification |
a)
Design Engineering, Retrofitting, Testing and d) Investigation of CPP, Unit 3 Generator Transformer failure. |
| 2006 | System Study, Testing Commissioning |
a) Synchronizing System Study. b) Re-engineering of Station Transformer Protection. c) Testing of relays at AC / DC Complex. d) Common electrical system relay testing. e)
CPP-Overhauling : Generator and substation equipments f)
Testing of Protective Relays, Transducers, Meters and |
|
| 12. |
Sterlite Industries (India) Ltd., Tuticorin,
Tamilnadu. |
Power System Study |
Power system study for electrical distribution including : a) Short Circuit Study. b) Relay Setting and co-ordination. c) Unit protections for generators, transformers. |
| Power Quality | Harmonic Analysis of Electrical Distribution Systems. | ||
| 11. | Ispat
Industries
Limited,
Dolvi 2003 |
Feasibility Study | Feasibility study for paralleling existing 11kV System with tertiary winding of 140 / 155 MVA Transformer |
| 10. | Essar
Steel
Limited,
Hazira 2003 |
System Study | System
study of electrical distribution system which includes, a) 3 Phase and 1 Phase Short Circuit Studies b) Review of protection system. c) Working out plant Relay Setting & Relay Co-ordination d) Unit Protection relay setting |
| 9. | Bharat
Aluminium Company Limited, Korba 2003 |
Trouble shooting, Scheme Testing and rectification |
Stability and Sensitivity Checks of Restricted earth Fault Scheme for Station Transformer at CPP Switchyard |
| 8. | Steel
Authority Of India Limited, Rourkela 2002-2003 |
System
Study
|
System
study of electrical distribution system which includes, e) Load Flow Studies f) Transient Stability to find out Critical Clearance Time (CCT) g) Review Of Mesh Distribution System h) Voltage Dip Studies i) Auto Changeover Schemes j) Review and Design of GIS and LSS |
| Reliability Improvement Exercise by Trouble shooting and rectification |
Testing of Busbar Differential Protective Scheme for 33 kV Bus, Generator Protective Relays, 132 kV Transmission Line Protection Relays, CT / PT Testing, Relay Testing Etc. |
||
| 7. | Madras
Aluminium Company Ltd., Mettur |
Reliability Improvement Exercise | Testing of power plant electrical system protective relays. |
| 2001, 2002, 2003 | System Study | Testing &
Commissioning of UAT - 1 at CPP.
Design and implementation of grid islanding and load shedding scheme. |
|
| System Study | Complete
Electrical System Study including,
a) Short
Circuit Studies |
||
| Reliability Improvement Exercise | Retrofit of existing Electromechanical relays with Numerical Protection relays for 25 MW Generator. | ||
| Testing - Commissioning of 220KV Switchyard with 2x40 MVA Transformer, 2x2.5MW D. G. set and HV / MV / LV distribution system auditing and testing. | |||
| 6.
|
M/s.
Birla Copper, A Divn. of Indo Gulf Fertiliser. (Copper Smelter) 1997, 1998, 1999, 2000, 2001,2002, 2003 |
EHV/HV
Switchyard
|
|
| Power Plant | Testing & Commissioning of power plant electrical system. | ||
| Detail engineering of 15 MW Thermal power plant. | |||
| Testing & Commissioning of 24.5 MW power plant electrical system. | |||
|
|
Reliability Improvement Exercise | a) Review of
power plant electrical system design engineering.
b) Scheme testing of 40 MVA,
132 kV / 11 kV / 11 kV |
|
| System Study | Design and implementation of grid islanding and load shedding scheme. | ||
| System
Study
Relay testing |
Complete Electrical System Study including, | ||
| a) Relay setting and relay co-ordination | |||
| b) Voltage dip studies | |||
| c) Load flow studies | |||
| d) Black start of T. G. set | |||
| e)
Engineering of the scheme for momentary paralleling of 11KV, 3.3KV and 415V incoming breakers. Testing of electrical equipment relays of existing electrical system during annual shutdown. |
|||
| 5. | Sterlite
Industries (I) Limited, Silvassa 2002 |
System Study | System
study of electrical distribution system which includes, a) 3 Phase and 1 Phase Short Circuit Studies b) Review of protection system. c) Working out plant Relay Setting & Relay Co-ordination d) Unit Protection relay setting |
| 4. | M/s
Indian Aluminium Co. Ltd., Taloja, Thane 1984, 1986,
1990, |
Testing of protective relays. | |
| 3. | Sesa
Industries Limited, Goa 1998 |
Reliability Improvement Exercise |
Testing and Calibration of relays at PIG Iron Plant. |
| 2.
|
M/s
Mukand Iron and Steel Works Ltd., Thane |
Relay testing | Testing of protective relays. |
| 1983, 1985 | Power Plant | Feasibility studies for installation of Thermal Power Plant for fluctuating furnace loads. | |
| 1.
|
M/s
Ramkishan Ispat Ltd., Taloja, Thane |
Relay
testing
|
Testing
of protective relays
|
| 1983, 1984 |