SR. NO. NAME OF THE COMPANY / REPEAT ORDERS RECEIVED SERVICES OFFERED DETAILS OF JOB EXECUTED
13. Madras Aluminium Company Ltd., 
Mettur - Tamilnadu
2005
Troubleshooting, Testing and Re - Commissioning and Rectification

a) Design Engineering, Retrofitting, Testing and        
    re-commissioning of new Numerical Generator Protection 
    relays for 25MW Gen # 1, 2, 3 by replacing the existing 
    relays.

b) Design Engineering
Testing and commissioning of new pilot 
    wire protection scheme for 110kV lines no.1 and 2 from 
    TNEB by replacing of the existing scheme.

c)
Testing - commissioning of  Common Auxiliary systems.

d) Investigation of CPP, Unit 3 Generator Transformer failure.

  2006 System Study, Testing Commissioning

a) Synchronizing System Study.

b) Re-engineering of Station Transformer Protection. 

c) Testing of relays at AC / DC Complex. 

d) Common electrical system relay testing.  

e) CPP-Overhauling : Generator and substation equipments 
    testing.

f) Testing of Protective Relays, Transducers, Meters and 
   Modification Jobs. 

12.

Sterlite Industries (India) Ltd., 

Tuticorin, Tamilnadu.
2005, 2006

Power System Study

Power system study for electrical distribution including :

a)  Short Circuit Study.

b)  Relay Setting and co-ordination.

c)  Unit protections for generators, transformers.

Power Quality Harmonic Analysis of Electrical Distribution Systems.
11. Ispat Industries Limited, Dolvi
2003
Feasibility Study Feasibility study for paralleling existing 11kV System with tertiary winding of 140 / 155 MVA Transformer
10. Essar Steel Limited, Hazira
2003
System Study System study of electrical distribution system which includes,
a) 3 Phase and 1 Phase Short Circuit Studies
b) Review of protection system.
c) Working out plant Relay Setting & Relay
    Co-ordination
d) Unit Protection relay setting
9. Bharat Aluminium Company Limited,  
Korba 
2003
Trouble shooting, Scheme Testing and rectification

Stability and Sensitivity Checks of Restricted earth Fault Scheme for Station Transformer at CPP Switchyard

8. Steel Authority Of India Limited
Rourkela

2002-2003

System Study

 

 

 

 

 

System study of electrical distribution system which includes,
a) 3 Phase and 1 Phase Short Circuit Studies
b) Review of protection and grounding system.
c) Working out plant Relay Setting & Relay
    Co-ordination
d) Unit Protection relay setting

e) Load Flow Studies

f)  Transient Stability to find out Critical Clearance Time (CCT)

g) Review Of Mesh Distribution System

h) Voltage Dip Studies

i) Auto Changeover Schemes

j) Review and Design of GIS and LSS

  Reliability Improvement Exercise by Trouble shooting and rectification

Testing of Busbar Differential Protective Scheme for 33 kV Bus,

Generator Protective Relays, 132 kV Transmission Line Protection 

Relays, CT / PT Testing, Relay Testing Etc.

7. Madras Aluminium Company Ltd.,  
Mettur
Reliability Improvement Exercise Testing of power plant electrical system protective relays.
2001, 2002, 2003 System Study Testing & Commissioning of UAT - 1 at CPP.

Design and implementation of grid islanding and load shedding scheme.

  System Study Complete Electrical System Study including,

a) Short Circuit Studies
b) Review of protection system
c) Working out plants relay setting & relay
    co-ordination
d) Grid Islanding and Under Frequency Load
    shedding scheme.
 

  Reliability Improvement Exercise   Retrofit of existing Electromechanical relays with Numerical Protection relays for 25 MW Generator.
 
Testing - Commissioning of 220KV Switchyard with 2x40 MVA Transformer, 2x2.5MW D. G. set and HV / MV / LV distribution system auditing and testing.
6.

 

 

 

 

 

 

 

 

 

M/s. Birla Copper, 
A Divn. of Indo Gulf Fertiliser. 
(Copper Smelter)
1997, 1998, 1999, 2000, 2001,2002, 2003
EHV/HV Switchyard

 

Power Plant Testing & Commissioning of power plant electrical system.
  Detail engineering of 15 MW Thermal power plant. 
Testing & Commissioning of 24.5 MW power plant electrical system.
 

 

 

 

 

 

 

 

Reliability Improvement Exercise a) Review of power plant electrical system design engineering.

b) Scheme testing of 40 MVA, 132 kV / 11 kV / 11 kV   
    Transformer.

System Study Design and implementation of grid islanding and load shedding scheme.
System Study

 

 

 

 

 Relay testing

Complete Electrical System Study including,
a) Relay setting and relay co-ordination
b) Voltage dip studies
c) Load flow studies
d) Black start of T. G. set
e) Engineering of the scheme for momentary paralleling of 
    11KV, 3.3KV and 415V incoming breakers.

Testing of electrical equipment relays of existing electrical system during annual shutdown.

5. Sterlite Industries (I) Limited
Silvassa
 2002
System Study System study of electrical distribution system which includes,
a) 3 Phase and 1 Phase Short Circuit Studies
b) Review of protection system.
c) Working out plant Relay Setting & Relay
    Co-ordination
d) Unit Protection relay setting
4. M/s Indian Aluminium Co. Ltd., 
Taloja, Thane

1984, 1986, 1990,
1993, 2001

  Testing of protective relays.
3. Sesa Industries Limited, Goa
1998
Reliability Improvement Exercise

Testing and Calibration of relays at PIG Iron Plant.

2.

 

M/s Mukand Iron and Steel Works Ltd., 
Thane
Relay testing Testing of protective relays.
1983, 1985 Power Plant Feasibility studies for installation of Thermal Power Plant for fluctuating furnace loads.
1.

 

M/s Ramkishan Ispat Ltd.,
Taloja, 
Thane
Relay testing

 

Testing of protective relays

 

1983, 1984

TOP