REFINERIES


Back


SR. NO. NAME OF THE COMPANY / REPEAT ORDERS RECEIVED

SERVICES OFFERED

DETAILS OF JOB EXECUTED

5. M/s. Hindustan
Petroleum Corpn. Ltd.,
Bombay.
Reliability
Improvement
Exercise
Testing of switchgear panel checks including protective relays.
1983 to 1989, 1990, Power Plant Testing & Commissioning of 3x10MW G.T. set and its electrical system equipments.
1991, 1992, 1994,
1995, 1997-98, 2001, 2003 Consultancy services a) Detailed design engineering and consultancy for
    Hexane Maximisation project.
b) Detail engineering consultancy for their electrical
    system revamping project, GEC group and major
    projects group.
c) Consultancy services, testing & commissioning of
    4 MVA Transformer and its electrical system for
    BPPL Project.
System study Review of existing protection system & workout relay
setting and co-ordination of complete electrical system.
Revamping and
modernisation of
system
Revamping of 6.6KV Motor Feeder protections
including design, installation, testing and
commissioning.
Consultancy service Refinery Expansion : Detail Engineering & erection
supervision for M. S. Maximisation -upgradation of
electrical facilities at fuels refinery.
System study System studies for working out Relay setting &
co-ordination for Fuels refinery, Lube refinery.
    System study Power Factor Improvement, Energy Power Factor Measurement and Reactive Compensation Study.
    System study System Study of Electrical distribution system of Mumbai-Pune Pipeline Division from 22 kV to 415 V system
4. M/s. Bharat Petroleum
Corpn. Ltd., Bombay.
Reliability
Improvement
Exercise
Testing of protective relays of complete electrical
system.
1984, 1986, 1989, 1991, 1992, 2001 Power Plant Associated in testing and commissioning 22.5 MW
GT set & its electrical equipments. 
Reliability
Improvement Exercise
Modification of trip logic of 22.5 MW G.T. Set as
class ABC for selective operation of Generator circuit
breaker, field circuit breaker and turbine trip solenoid
valve.
    Relay Testing Testing of GTG-2 Protective relays
  2004 Reliability
Improvement Exercise
Testing and Commissioning of Gas Insulated panels, Synchronization, Control and Annunciation panels, Import/ Export Limiter panel for 2 Nos TCE incomers, 2 Nos 18 MW Generators and 1 No 33 MW Generator.
  2006 Relay Testing Testing of relays CTs, PTs, Breakers, VCBs and ACB
3.

 

M/s Oil & Natural Gas
Corporation, Uran.
Power
Plant-Reliability
Improvement
Exercise
Testing of 2Nos,20 MW G.T. set's Asea make
Combiflex type protective relays.
1987, 1989, 1992
2.

 

M/s Oil & Natural Gas Corporation, Hazira. Reliability
Improvement
Exercise
Testing of GEC make static generator Protection relays.
1993
1. M/s Oil & Natural Gas
Corporation's Offshore
Platforms -
System testing &
trouble shooting
Testing and calibration of electrical system
protective relays and testing of HT switchgears.
a) WIN Platform
1993, 1994, 1998
  Study, review and testing commissioning of 6.6KV
Motor Protection scheme and working out fresh
relay setting and co-ordination
b) BHN Platform Modification of generator Differential Protection
scheme.
1993, 1997
c) BLQ - BPA Platform Testing and calibration of electrical system
protective relays
1995, 1997
d) Infill Complex Study, review, design, testing and  commissioning    of  synchronizing scheme for power transfer from
ICG-Emergency DG to ICP 415V Bus.
1995, 1997
e) NQO-NQP Platform Testing of electrical system relays and H.T.
Switchgears.
1995, 1997
f) SH platform Testing of Electrical System and protective relays
and equipments.
 1998