Home
                     

Home

Company Profile services Infrastructure Experience Enquiry Enquiry Online Resume Submission


INTERNATIONAL PROJECTS


Back


SR. NO.

NAME OF THE COMPANY 

SERVICES OFFERED

DETAILS OF JOB EXECUTED

34.

PT Citra Kusuma Perdana, Sangatta, East Kalimantan, Indonesia

2011

Consultancy Services

Consultancy Services for Electrical Power System Study of

3X18 MW Coal Fired Steam Power Plant.

33.

KNPC Mina Abdulla Refinery, Eartha / Kremenco.

2011

Consultancy Services

Engineering consultancy work for selection of Current Transformers for the Differential Protection of Recycle Gas Compressor Motor.

32.

Shadeed Iron & Steel LLC (Jindal Shadeed), Oman

2011

System Studies

Relay Setting & Relay Coordination study

31.

Alghanim International General Trading & Contracting Co. W.L.L., Kuwait

2011

Consultancy Services

Investigation for the tripping of 131.13 KVA ESP Transformers at KNPC, Kuwait, MAA Refinery.

30.

Punj Lloyd PTE Ltd. / PT. Makmur Sejahtera Wisesa (MSW),  

Indonesia

2010

Consultancy Services

Providing Electrical Engineering Consultancy Services for 2 X 30 MW, Coal fired Power Plant project at Tanjung - Tabalong, Indonesia.

 

29.

PT. Indorama Synthetics Tbk, CPP,

Indonesia

2009

Testing and Commissioning and Condition Monitoring

a) Condition Monitoring Testing for Generator, Exciter and Generator

    Transformer.

b) Testing of Protective Relays,  CTs, PTs, Switch Gear and

    Schemes.

28.

Abu Dhabi Oil Refining Company,

Takreer 

2009

System Studies

Relay Setting, Relay Co-ordination study for electrical system of Abu Dhabi Oil Refinery, Ruwais Sulphur Expansion Phase III project.

27.

 

PT. Indorama Synthetics Tbk, CPP,

Indonesia

2009

Testing and Commissioning

Site visit and summarizing Analysis of Major Faults in Indorama Power Plant.

26.

KAMAL Engineering Consultants,

Dubai 

2008

System Studies

Relay Setting, Relay Co-ordination and Harmonic Analysis for District Cooling Plant Project.  

25.

PT. Indorama Synthetics Tbk, CPP,

Indonesia

2008

Consultancy Services

Site visits and Occurrence Review.

24.

 

PT. Indorama Synthetics Tbk, CPP,

Indonesia

2008

Testing and Commissioning

a) Testing of Protective Relays and Schemes for Unit-1 & Unit-2.

b) Condition Monitoring Testing of 30 MW, Unit-I and 2 x 10 MVA,

    HT Auxiliary Transformer.

c) Testing and Commissioning of Grid Islanding and Load Shedding

    Scheme.

23.

 

PT. Indorama Synthetics Tbk, Polyester Division, Indonesia

2008

System Studies

Our Scope of work includes the following,

a) Load flow study.

b) Short circuit study.

c) Relay setting and relay co-ordination study.

22.

CHEMAF S.P.R.L.,

(Republic of Congo),

Africa

2008

System Studies

Feasibility study of Load Flow, Short Circuit and Relay Co-ordination of existing Plant electrical distribution system and upgrading the same with upcoming new requirements / projects.

21.

 

Hajar Trading & Technical Services,

Kingdom of Bahrain 

2007

Testing and Commissioning

Modification and Overhauling of 11 kV Medinsha VCB’s for Bahrain MEW. This includes carrying out,  

a) Wiring modification of auxiliary switches for Meidensha Make

    VCB’s, Type VFT-12 and

b) Modification to replace existing auxiliary contact (Finger contacts)

    block.

20.

 

PT Indorama Synthetic Tbk, CPP,

Indonesia

2007

System Studies

Power System Study for the electrical system including :

a) Short circuit study. 

b) Relay Setting and Co-ordination of 30 x 2 MW Power Plant. 

c) Unit protection settings

d) Transient Stability Studies. 

e) Design Engineering of Grid Islanding Scheme (GIS) and

    Load Shedding Scheme (LSS).

19. Emirates Trading Agency L.L.C., Associated Constructions & Investments Co., L.L.C., 
U.A.E.  
2007
Consultancy Services Deputation of Senior Executive for providing Consulting Services in connection with ALBA - RST Failure.   
18. SAUDI BASIC INDUSTRIES CORP. (SABIC), 
Saudi Arabia 
2006

Detail Engineering

Detail engineering for upgradation of existing UPS system for IT Department.                         

This includes,

a) Study / evaluate existing UPS power system network and 
    suggest rating of new UPS.

b) Preparation of technical specifications, drawings for the new 
    equipments.

c) Preparation of drawings for layout of equipment, cable tray 
    layouts etc. 

d) Preparation of specifications for engineering package.

17. JOINT OPERATIONS, Wafra, Kuwait
2005
System Studies Relay co-ordination study for electrical system of Water Disposal Phase III Drain Recycling facility.
16.

 

JOINT OPERATIONS, Wafra, Kuwait

2005

System Studies

Electrical system study of Wafra electrical system including, Short circuit study.

a)  Relay setting and co-ordination.

b)  Load flow studies and steady state voltage drop studies.

Calculate Sag and Tension for 34.5 kV and 13.8 kV transmission lines.

15

 

Heavy Engineering Industries  Shipbuilding Co. (K.S.C), 
Kuwait for KNPC

2005

Testing and Commissioning Testing and Commissioning of 3.3 kV feeder for new                      3.3 kV / 460 V Transformer of Sludge Handling Plant
 14.

Kuwait National Petroleum Company 

Kuwait

2005

System Study

System study for Mina Abdulla Refinery  electrical distribution system including,

a)  Short circuit study.

b)  Relay setting and co-ordination.

c)  Unit protection settings of synchronous motor, synchronous 
     generator, transformers etc.

13.

 

Kuwait National Petroleum Company 

Kuwait

2005

Consultancy services Consultancy services during project execution of revamping of Frequency Converter system. This includes review of documents prepared by vendors and advise KNPC on various detail engineering issues related to this project.
12. PT. INDO BHARAT RAYON LTD., 
Indonesia
2004

System Studies

Scope Of Work includes,

a)   Rationalization of Electrical Power Distribution.

b)   Detail engineering of Power evacuation for new 2 x 10.8MW CPP

c)   Rationalization of Power Source Grounding System.

d)  Carryout Transient stability studies, load flow study, short circuit 
     study and Relay co-ordination study.

e)  Design and engineering of Grid Islanding scheme and post 
     islanding
Load shedding schemes.

11.

Heavy Engineering Industries  Shipbuilding Co. (K.S.C), 
Kuwait for KNPC

2004

System Study Study of Relay setting and relay co-ordination for the electrical system of Sludge Handling Plant
10.

 

Kuwait National Petroleum Company 

Kuwait

2004

System Study Relay setting and Co-ordination study for electrical system of Sludge handling plant.
9.

FIji Electricity Authority, FEA

Fiji

2003

System Study Study of voltage profile, VAR compensation, stability and Relay setting and relay co-ordination for the Wainekasou and Wailoa     sub-station electrical system. 
8.

 

Kuwait National Petroleum Company 

Kuwait

2003
System Study Study of current collector and speed variation technique and suggest improvement for bridge crane unit 47.
7.

 

Kuwait National Petroleum Company 

Kuwait

2003
System Study Study of protection relay co-ordination and readjustment of protective relay setting at MAB refinery.
6.

Kuwait National Petroleum Company 

Kuwait

2002

Consultancy Services

Consultancy Services for Revamp of Frequency Conversion System for Reliability. The scope of work was,

a) Evaluation of Critical Clearing Time for faults in utility and revision 
    of Synchronous Motor – Generator relay settings accordingly

b) Up gradation of Protection logic for Synchronous Motor – 
    Generator Set (Frequency Conversion unit)

c) Detail engineering for implementation of suggested schemes for 
    reliability improvement.

5.

Petrochemical Industries Corporation 

Kuwait.

2002

System Study Consultancy services for Electrical system modification.
4.

Kuwait Oil  Company 

Kuwait

2002

System Study

Scope of work for the system study includes,

a)  Carry out System Fault analysis with new machines to check the
     adequacy of the existing rating of switchgears.

b)  Review of Integrated Protection Scheme for H.T. Motors.

c)  Determine the adequacy of existing generator ratings.

3.

Kuwait Oil  Company 

Kuwait

2002

Consultancy

Cable sizing calculation for new crude export pipeline from NK to CMM

2.

TCL INDUSTRIES (MALAYSIA) SDN BHD, 

Malaysia

1998

Power Plant  7 MW steam based power plant, detail engineering, Testing & Commissioning and complete system study.
1.

P.T. Polysindo Eka Perkasa

Indonesia

1998

System Study Working of complete electrical system, short circuit, load flow, stability and protective relay settings and co-ordination on software.

TOP
  
         


                                                                                                                                                                                                                            Update : 22.12.2011