| SR. NO. |
NAME OF THE COMPANY |
SERVICES OFFERED |
DETAILS OF JOB EXECUTED |
| 11. |
Emirates
Trading Agency L.L.C., Associated Constructions & Investments Co.,
L.L.C., U.A.E. 2007 |
Consultancy Services | Deputation of Senior Executive for providing Consulting Services in connection with ALBA - RST Failure. |
| 10. |
SAUDI BASIC
INDUSTRIES CORP. (SABIC), Saudi Arabia 2006 |
Detail Engineering |
Detail
engineering for upgradation of existing UPS system for IT Department.
This
includes, a)
Study / evaluate existing UPS power system network and b)
Preparation of technical specifications, drawings for the new c)
Preparation of drawings for layout of equipment, cable tray d) Preparation of specifications for engineering package. |
| 9. |
JOINT
OPERATIONS, Wafra, Kuwait 2005 |
System Studies | Relay co-ordination study for electrical system of Water Disposal Phase III Drain Recycling facility. |
| 2005 |
System Studies |
Electrical
system study of Wafra electrical system including, Short circuit study. a)
Relay setting and co-ordination. b)
Load flow studies and steady state voltage drop studies. Calculate Sag and Tension for 34.5 kV and 13.8 kV transmission lines.
|
|
| 8. |
PT. INDO
BHARAT RAYON LTD., Indonesia 2004 |
System Studies |
Scope
Of Work includes, a)
Rationalization of Electrical Power Distribution. b)
Detail engineering of Power evacuation for new 2 x 10.8MW CPP c)
Rationalization of Power Source Grounding System. d)
Carryout Transient stability studies, load flow study, short circuit e)
Design and engineering of Grid Islanding scheme and post |
| 7. |
Heavy
Engineering Industries Shipbuilding Co. (K.S.C), 2004 |
System Study | Study of Relay setting and relay co-ordination for the electrical system of Sludge Handling Plant |
| 2005 | Testing and Commissioning | Testing and Commissioning of 3.3 kV feeder for new 3.3 kV / 460 V Transformer of Sludge Handling Plant | |
| 6. |
FIji Electricity Authority, FEA Fiji 2003 |
System Study | Study of voltage profile, VAR compensation, stability and Relay setting and relay co-ordination for the Wainekasou and Wailoa sub-station electrical system. |
| 5. |
Kuwait National Petroleum Company Kuwait 2002 |
Consultancy Services |
Consultancy
Services for Revamp of Frequency Conversion System for Reliability. The
scope of work was,
a) Evaluation of Critical Clearing Time for faults in utility and
revision b)
Up gradation of Protection logic for Synchronous Motor – c)
Detail engineering for implementation of suggested schemes for |
| 2003 | System Study | Study of current collector and speed variation technique and suggest improvement for bridge crane unit 47. | |
| 2003 | System Study | Study of protection relay co-ordination and readjustment of protective relay setting at MAB refinery. | |
| 2004 | System Study | Relay setting and Co-ordination study for electrical system of Sludge handling plant. | |
| 2005 | System Study |
System
study for Mina Abdulla Refinery electrical distribution system
including, a)
Short circuit study. b)
Relay setting and co-ordination.
c) Unit protection settings of synchronous motor, synchronous |
|
| 2005 | Consultancy services | Consultancy
services during project execution of revamping of Frequency Converter
system. This includes review of documents prepared by vendors and advise
KNPC on various detail engineering issues related to this project. |
|
| 4. |
Petrochemical Industries Corporation Kuwait. 2002 |
System Study | Consultancy services for Electrical system modification. |
| 3. |
Kuwait Oil Company Kuwait 2002 |
System Study |
Scope
of work for the system study includes, a)
Carry out System Fault analysis with new machines to check the b)
Review of Integrated Protection Scheme for H.T. Motors. c) Determine the adequacy of existing generator ratings. |
| 2002 |
Consultancy |
Cable sizing calculation for new crude export pipeline from NK to CMM |
|
| 2. |
TCL INDUSTRIES (MALAYSIA) SDN BHD, Malaysia 1998 |
Power Plant | 7 MW steam based power plant, detail engineering, Testing & Commissioning and complete system study. |
| 1. |
P.T. Polysindo Eka Perkasa Indonesia 1998 |
System Study | Working of complete electrical system, short circuit, load flow, stability and protective relay settings and co-ordination on software. |
Update : 23.03.07