INTERNATIONAL PROJECTS


Back


SR. NO.

NAME OF THE COMPANY 

SERVICES OFFERED

DETAILS OF JOB EXECUTED

25. PT Punj Llyod., Indonesia

Nov-10

 

Testing & commissioning

Deputation of Engineer to ABB Vietnam works for factory Acceptance Testing (FAT) of following Transformers.
a.  2 Nos. 40MVA, 66/11 kV
b.  1 No. 12MVA, 66/20 kV
c.  2 Nos. 10MVA, 11/6.9 kV
d.  3 Nos. 2.5MVA, 6.6/0.4 kV.

24.

Punj Lloyd PTE Ltd. / PT. Makmur Sejahtera Wisesa (MSW),  

Indonesia

2010

Consultancy Services

Providing Electrical Engineering Consultancy Services for 2 X 30 MW, Coal fired Power Plant project at Tanjung - Tabalong, Indonesia.

23. PT Indorama Synthetics Tbk, Indonesia
Oct-14
Testing & commissioning

a.  2 x 30 MW Chinese power plant, Chinese make relay testing.

b.  Testing and commissioning of 2 Nos. 100 MVA transformer.  

Mar-14  

220 kV switchyard bay and its equipments.

  Testing & commissioning

Testing of Grid Islanding and Load Shedding Scheme and its protection relays.

Jul-08 Testing & commissioning

Testing and commissioning of Grid Islanding and Load shedding scheme for 2 x 30 MW CPP.

May-08 Testing & commissioning

Testing of 30 MW Unit-I for,

a.  CTs, PTs.

b.  Chinese Generator protection relay

c.  Chinese Generator transformer protection relay

d.  Generator differential stability and sensitivity schemes.

e.  Overall differential protection stability sensitivity scheme

f.   Electrical system protective relays.

  Testing & commissioning

Testing of Protective Relays and Schemes. UNIT 1. 

2012

Consultancy Services

Site visit and summarizing Analysis of Major Faults in Indorama Power Plant.

2009

Testing and Commissioning and Condition Monitoring

Site visits and Occurrence Review.

2009

Testing and Commissioning

a.  Testing of Protective Relays and Schemes for Unit-1 & Unit-2.

b.  Condition Monitoring Testing of 30 MW, Unit-I and 2 x 10 MVA,

     HT Auxiliary Transformer.

c.  Testing and Commissioning of Grid Islanding and Load Shedding

     Scheme.

2008

Consultancy Services

Our Scope of work includes the following,

a.  Load flow study.

b.  Short circuit study.

c.  Relay setting and relay co-ordination study.

2008

Testing and Commissioning

Power System Study for the electrical system including :

a.  Short circuit study. 

b.  Relay Setting and Co-ordination of 30 x 2 MW Power Plant. 

c.  Unit protection settings

d.  Transient Stability Studies. 

e.  Design Engineering of Grid Islanding Scheme (GIS) and

     Load Shedding Scheme (LSS).

2008

System Studies

Our Scope of work includes the following,

a.  Load flow study.

b.  Short circuit study.

c.  Relay setting and relay co-ordination study.

2007

System Studies

Power System Study for the electrical system including :

a.  Short circuit study. 

b.  Relay Setting and Co-ordination of 30 x 2 MW Power Plant. 

c.  Unit protection settings

d.  Transient Stability Studies. 

e.  Design Engineering of Grid Islanding Scheme (GIS) and

     Load Shedding Scheme (LSS).

2008-09 Condition monitoring testing

Condition monitoring testing of  Generator Stator, Rotor, Exciter, Generator Transformer and HT Auxiliary Transformer for Unit-1 and Unit-2.

  System Studies

Design Engineering Services :

The Scope of work shall includes,

a.   I.  Review of AC schematics and CT connection diagrams for,

i.  Generator differential protection.

ii. Generator transformer overall differential protection.

II.  Work out the summary of final settings to be adopted for

     both Differential Protections Scheme.

III.  Review test results of CT testing and scheme testing

     during implementation.

b.  Introduction of “37 Low Forward Power Protection Scheme” :

Carry out the pre-engineering for introduction of low forward

power protection for Class- B tripping and working out setting.

c.  Engineering of redundant GIS Protection Scheme :

I.  Prepare the Programmable Scheme Logic (PSL) of relay   

    for the implementation of GIS schemes within the relay.

II.  Work out GIS Setting for redundant scheme logic.

22.

PT IndoRama Polychem Indonesia (IPCI)

2013

Consultancy Services

Carrying out Power System Study of Electrical Distribution System

of CP-4.

The scope of work includes,

a.  Review of existing protection application, identify deficiencies if any in protection application and suggest missing protection. Provide functional specification for additional relays suggested.

b.  Carrying out Short Circuit Studies at various location in  electrical distribution system for normal operating condition to identify the Phase to Phase and Phase to Ground Fault Current.

c.  Carry out,

     i.  Phase Fault Relay Co-ordination and

     ii. Ground Fault Relay Co-ordination.

d.  Work out Unit Protection settings for,

     i.   Generators,

     ii.  Transformers,

     iii.  MV Motors,

     iv.  LV Motors.

e.  Load Flow study.

f.   Review of Grounding Method and its operating practice.

g.  Engineering Grid Islanding & Load Shedding Scheme for continuous parallel operation.

21.

PT IndoRama Ventures, Indonesia (IVI)

2013

 

Consultancy Services

Carrying out Power System Study of Tangerang Project.

a.  Review of existing protection application, identify deficiencies

     if any in protection application and suggest missing protection.

     Provide functional specification for additional relays

     suggested.

b.  Carrying out Short Circuit Studies at various locations in

     electrical distribution system for normal operating condition to

     identify the phase to phase and phase to ground fault current.

c.   Carry out,

      i.  Phase Fault Relay Co-ordination and

      ii. Ground Fault Relay Co-ordination

d.   Work out Unit Protection Settings for,

      i.  Transformers,

      ii. MV Motors,

      iii.LV Motors.

e.   Load Flow study .

f.    Grid Islanding and Load Shedding Scheme & Synchronizing

     Scheme.

g.   Carry out Transient Stability Study with Background Load Flow

     Study.

h.   Review of existing PLN1 + CPP. 

20.

PT. INDO BHARAT RAYON LTD., 
Indonesia
2004

System Studies

Scope of Work includes,

a.   Rationalization of Electrical Power Distribution.

b.   Detail engineering of Power evacuation for new 2 x 10.8MW

     CPP

c.   Rationalization of Power Source Grounding System.

d.  Carryout Transient stability studies, load flow study, short

     circuit study and Relay co-ordination study.

e.  Design and engineering of Grid Islanding scheme and post 
     islanding Load shedding schemes.

19.

PT Citra Kusuma Perdana, Sangatta, East Kalimantan, Indonesia

2011

Consultancy Services

Consultancy Services for Electrical Power System Study of

3X18 MW Coal Fired Steam Power Plant.

18.

P.T. Polysindo Eka Perkasa

Indonesia

1998

System Study

Working of complete electrical system, short circuit, load flow, stability and protective relay settings and co-ordination on software.

17.

Egyptian Propylene & Polypropylene Co., Cairo, Egypt

2013

Consultancy Services

Analysis of Tripping of 220 kV Line Feeder.

16.

CHEMAF S.P.R.L.,

(Usoke Plant)

Democratic Republic of Congo, Lubumbashi

2012

System Studies

Scope of work includes carrying out Load Flow Studies on ETAP software.

2012

System Studies

Part – I : Studies for 220 kV switchyard :

Preparation of Single line diagram, designing basic ratings of

   equipment and Electrical system distribution.

  Study for selection of Distribution Voltage of 33 kV or 11 kV.

  Preparation and submission of purchase specification for the
    equipments.

  Technical tender analysis of vendor’s offer.
  Carrying out Power System Studies:

    a.  Load Flow

    b.  Short Circuit and

    c.  Relay Setting, relay co-ordination for phase fault and earth

         fault.

Part – II : Power System Study for New Process Plants :

Define Transformer voltage ratio, Vector Group and %

   impedance.

Carry out short circuit study to work out,

    a.  Short Circuit rating of Switchgear and Neutral Grounding

         Method

    b.  Voltage dip studies for Motors

 Carry out feasibility study for emergency transfer of power

 Prepare purchase specification for Transformer and Motor

2008

System Studies

Feasibility study of Load Flow, Short Circuit and Relay Co-ordination of existing Plant electrical distribution system and upgrading the same with upcoming new requirements / projects.

15.

KNPC Mina Abdulla Refinery, Eartha / Kremenco.

2011

Consultancy Services

Engineering consultancy work for selection of Current Transformers for the Differential Protection of Recycle Gas Compressor Motor.

14.

Shadeed Iron & Steel LLC (Jindal Shadeed), Oman

2011

System Studies

Relay Setting & Relay Coordination study

13.

Alghanim International General Trading & Contracting Co. W.L.L., Kuwait

2011

Consultancy Services

Investigation for the tripping of 131.13 KVA ESP Transformers at KNPC, Kuwait, MAA Refinery.

12.

KAMAL Engineering Consultants,

Dubai 

2008

System Studies

Relay Setting, Relay Co-ordination and Harmonic Analysis for District Cooling Plant Project.  

11.

Abu Dhabi Oil Refining Company,

Takreer 

2009

System Studies

Relay Setting, Relay Co-ordination study for electrical system of Abu Dhabi Oil Refinery, Ruwais Sulphur Expansion Phase III project.

10.

 

Hajar Trading & Technical Services,

Kingdom of Bahrain 

2007

Testing and Commissioning

Modification and Overhauling of 11 kV Medinsha VCB’s for Bahrain MEW. This includes carrying out,  

a.  Wiring modification of auxiliary switches for Meidensha Make

     VCB’s, Type VFT-12 and

b.  Modification to replace existing auxiliary contact (Finger

    contacts) block.

9.

Emirates Trading Agency L.L.C., Associated Constructions & Investments Co., L.L.C., 
U.A.E.  
2007

Consultancy Services

Deputation of Senior Executive for providing Consulting Services in connection with ALBA - RST Failure.    

8.

SAUDI BASIC INDUSTRIES CORP. (SABIC), 
Saudi Arabia 
2006

Detail Engineering

Detail engineering for upgradation of existing UPS system for IT Department.                         

This includes,

a.  Study / evaluate existing UPS power system network and 
     suggest rating of new UPS.

b.  Preparation of technical specifications, drawings for the new 
     equipments.

c.  Preparation of drawings for layout of equipment, cable tray 
     layouts etc. 

d.  Preparation of specifications for engineering package.

7.

 

JOINT OPERATIONS, Wafra, Kuwait
2005

System Studies

Relay co-ordination study for electrical system of Water Disposal Phase III Drain Recycling facility.

2005

System Studies

Electrical system study of Wafra electrical system including, Short circuit study.

a.  Relay setting and co-ordination.

b.  Load flow studies and steady state voltage drop studies.

Calculate Sag and Tension for 34.5 kV and 13.8 kV transmission lines.

6.

Heavy Engineering Industries  Shipbuilding Co. (K.S.C), 
Kuwait for KNPC

2005

Testing and Commissioning

Testing and Commissioning of 3.3 kV feeder for new 3.3 kV / 460 V Transformer of Sludge Handling Plant.

2004

System Study

Study of Relay setting and relay co-ordination for the electrical system of Sludge Handling Plant

5.

FIji Electricity Authority, FEA

Fiji

2003

System Study

Study of voltage profile, VAR compensation, stability and Relay setting and relay co-ordination for the Wainekasou and Wailoa sub-station electrical system. 

4.

Kuwait National Petroleum Company 

Kuwait

2005

System Study

System study for Mina Abdulla Refinery  electrical distribution system including,

a.  Short circuit study.

b.  Relay setting and co-ordination.

c.  Unit protection settings of synchronous motor, synchronous 
     generator, transformers etc.

2005

Consultancy services

Consultancy services during project execution of revamping of Frequency Converter system. This includes review of documents prepared by vendors and advise KNPC on various detail engineering issues related to this project.

2004

System Study

Relay setting and Co-ordination study for electrical system of Sludge handling plant.

2003

System Study

Study of current collector and speed variation technique and suggest improvement for bridge crane unit 47.

2003

System Study

Study of protection relay co-ordination and readjustment of protective relay setting at MAB refinery.

2002

Consultancy Services

Consultancy Services for Revamp of Frequency Conversion System for Reliability. The scope of work was,

a. Evaluation of Critical Clearing Time for faults in utility and

    revision of Synchronous Motor – Generator relay settings

    accordingly

b. Up gradation of Protection logic for Synchronous Motor – 
    Generator Set (Frequency Conversion unit)

c. Detail engineering for implementation of suggested schemes for 
    reliability improvement.

3.

Kuwait Oil  Company 

Kuwait

2002

System Study

Scope of work for the system study includes,

a.  Carry out System Fault analysis with new machines to check

     the adequacy of the existing rating of switchgears.

b.  Review of Integrated Protection Scheme for H.T. Motors.

c.  Determine the adequacy of existing generator ratings.

2002

Consultancy

Cable sizing calculation for new crude export pipeline from NK to CMM

2.

Petrochemical Industries Corporation 

Kuwait.

2002

System Study

Consultancy services for Electrical system modification.

1.

TCL INDUSTRIES (MALAYSIA) SDN BHD, 

Malaysia

1998

Power Plant 

7 MW steam based power plant, detail engineering, Testing & Commissioning and complete system study.

TOP
  
         


                                                                                                                                                                                                                            Update : 01.12.14