| SR. NO. | NAME OF THE COMPANY / REPEAT ORDERS RECEIVED |
SERVICES OFFERED |
DETAILS OF JOB EXECUTED |
| 31. |
The Associated Cement
Companies Limited, Chaibasa Cement Works 2005 |
Testing and Commissioning | Testing and Commissioning of 15MW Steam Turbine Generator Set. |
| 30. |
The Associated Cement
Companies Limited, Chaibasa Cement Works 2005 |
Testing and Commissioning |
Testing and Commissioning of new cement plants : Relays, C.T's, P.T's, Controls Check and Schemes.
|
| 29. |
Grasim
Industries Limited,
2005 |
Annual Protection system checks | Annual protection system checks with switchgear transformers, Generators, protection schemes and protection relays. |
| 28. |
Grasim
Industries Limited,
2004 |
Testing |
Our Scope Of Work includes, |
| 27. |
Hindustan
Lever Limited,
2004 |
Relay Testing and Calibration |
Testing and Calibration of Protective Relays . |
| 26. |
Hindustan
Lever Limited,
2004 |
Relay Testing and Calibration |
Testing and Calibration of Protective Relays . |
| 25. |
Grasim
Industries Limited,
2004 |
Testing and Commissioning |
Our Scope Of Work includes, |
| 24. |
Hindustan
Lever Limited,
2004 |
System study |
Power System Study
for electrical distribution system including : |
| 23. |
Emami
Paper Mills Limited,
2004 |
System study |
Power System Study
for electrical distribution system including : |
| 22. |
Hind
Lever Chemicals Limited,
2004 |
System study |
Power System Study
for electrical distribution system including : |
| 21. |
Hindustan Lever Limited, Nasik
2004 |
Reliability Improvement Exercise |
Testing and Commissioning of complete Electrical System. |
| 20. |
Century Enka Limited, Pune |
Reliability Improvement Exercise |
Testing and Commissioning of 6.0 MW Power Plant and its Associated Electrical System. |
| 2005, 2006, 2007 | Relay Testing | Testing of Electrical System, Protective Relays, Current Transformer and Potential Transformer. | |
| 19. |
HEG
Limited,
2004 |
Reliability Improvement Exercise |
Testing and Commissioning of Tawa Hydroelectric Plant Electrical System. |
| 18. |
Hindustan
Lever Limited,
2003 |
Relay Testing and Calibration |
Testing and Calibration of Electrical System Protective Relays . |
| 17. |
Atul
Limited,
2003 |
Relay Testing and Commissioning |
Testing and Calibration of Electrical System Protective Relays and Scheme testing of Transformers. |
| 16. |
Schenectady
Herdillia Limited,
2003 |
System study |
Electrical System Study Including, a) 3 Phase and 1 Phase Short Circuit Studies b) Relay Setting and relay Co-ordination c) Unit Protection Study |
|
2004 |
Relay Testing and Commissioning |
Our Scope Of Work includes, Testing and Commissioning of New 6.6 KV Switchgear (CT, PT, Relay), Testing and Calibration of ABB Make Numerical (SPAJ) Relays |
|
| 15. | Unimers
India Pvt. Ltd., Mumbai 2003 |
Relay Testing | Testing and Calibration of Electrical System Protective Relays |
| 14. | Crompton
Greaves Limited, Mumbai 2001 |
System study | Electrical
system studies for working out Relay setting and relay co-ordination |
| 13. | Moser
Baer, Noida 2000 |
System study | Harmonics measurement analysis and System study. |
| 12. | Orient
Paper Mills Limited, Amlai 2001 |
Relay Testing | Testing of electrical system protective relays and three phase energy meters under normal running load condition.. |
| 11. | Essar
Power Ltd., Hazira 2000, 2001,2002 |
System Testing | 500MW IPP Complete Electrical System Testing. |
| 10. | Hindustan
Lever
Limited, Sewree 1988, 1990, 1992, 1995, 1998, 1999, 2000, 2001 |
Testing and Commissioning | Testing and calibration of electrical system protective Relays |
| 9. | M/s Eurotex
Industries and Exports Limited, Kolhapur, 1997 |
Testing and Commissioning | Investigation of
reason for unbalance current observed in MSEB feeder when Captive power plant, D.G. Sets operate in parallel with MSEB |
| 8. | Grasim
Industries Ltd., Grasilene and Harihar Polyfiber 1999, 2001, 2003 |
System Study for Captive Power Plant | Electrical
System Study including , a) Load flow studies b) Short circuit studies c) Grid Islanding and Under frequency Load Shedding Scheme d) Relay setting and relay co-ordination |
| Reliability Improvement Exercise | Testing of complete plant protective relays. | ||
| 7. | DCW
Limited, Dhrangadhra 1998 |
Reliability Improvement Exercise | Checking and Testing of EE, ABB make protective relays of 3.45MW BHEL T.G. set. |
| 6. | Grasim
Industries Limited, Nagda 1996, 1997, 1998, 1999 , 2000 , 2001 |
System Study | Relay setting and co-ordination of 40MW power plant and electrical protection system. |
| Power Plant | Testing and Commissioning of 40MW co-generation power plant. | ||
| Reliability Improvement Exercise | Electrical system equipments / protective relays servicing, testing, calibration for EC-1, 12.5MW & 16.5MW T.G. sets. | ||
| 5. | Tarapur
Atomic Power Station, Tarapur 1989,1990 |
EHV/HV Switchyard | 100 MVA and 260 MVA, 11/220KV Generator Transformer testing and commissioning. |
| 4. | Hindustan
Motors Limited, Pithampur 1991 |
System Study | Review of complete existing system protective relay settings and co-ordination on software. |
| 3. | Hindustan
Lever Limited, Bombay 1988, 1990,
1992, 1995, 1998, 2001, |
Reliability Improvement Exercise | Testing of electrical system protective relays. |
| 2003 | System Study | Review of complete existing system protective relay settings and co-ordination on software. | |
| 2. | Heavy
Water Project, Kota 1990 |
Power Plant | Testing and Commissioning of electrical system of new steam generation plant |
| 1. | National
News Prints and Paper Mills, Nepanagar 1989 |
Reliability Improvement Exercise | Testing of protective relays. |