POWER SYSTEM STUDIES CURRENT UPDATES |
|
|
SR. NO. |
CLIENT / SERVICES |
TYPE OF JOB |
| 14.0 |
Indo Rama Synthetics (I) Ltd., Nagpur.
|
Consultancy Service for Relay Setting, Relay Co-ordination and Grid Islanding & Load Shedding Scheme engineering for 2 x 15.0 MW Captive Co-generation Thermal Power Plant, 3 x 13.5 MW + 3 x 4 MW DG Power Plants and Grid System at our Plant Butibori, Nagpur. The scope includes, a) Relay Setting and Relay Co-ordination study for electrical distribution system. i) Short Circuit study. ii) Protection Review. iii) Relay Setting and Relay Co-ordination. iv) Working out Unit Protection Settings. b) Grid Islanding and Load Shedding Scheme. i) Load flow study. ii) Transient stability study. iii) Engineering of Grid Islanding and Load Shedding Scheme. iv) Working out Relay setting for Grid islanding and Load Shedding Scheme. |
| 13.0 |
Kamal Engineering Consultants, Dubai. |
Carrying out Relay Setting, Relay Co-ordination and harmonic analysis for District Cooling plant project.
|
| 12.0 |
ACC Ltd, Wadi unit
|
Our Scope of work includes carrying out Relay Setting, Relay Co-ordination for Existing Wadi Plant, New Wadi Plant and CPP as follows : a) Short Circuit Study. b) Relay Co-ordination study. c) Working out Unit Protection Settings. |
| 11.0 |
Deepak Fertilizers and Petrochemicals Corp.Ltd.,Taloja. |
Power System Study for the electrical system including : a) Transient stability study. b) Engineering of Grid Islanding and Load Shedding Scheme.
c) Preparation of purchase specification for
grid Islanding and Load Shedding d) Relay settings of Grid Islanding and Load shedding protection. |
| 10.0 |
PT. Indorama Synthetics Tbk, Polyester Division, Indonesia.
|
Power System Study for the electrical system including : a) Load flow study. b) Short circuit study. c) Relay setting and relay co-ordination study. |
| 9.0 |
GRASIM INDUSTRIES LTD, (CHEMICAL DIVISION.), Nagda
|
Power System Study for the electrical system including : a) Load Flow Study b) Short Circuit Study c) Relay Setting and Relay Co-ordination Study |
| 8.0 |
ESSAR STEEL LTD., Vishakhapatnam |
Study of Capacitor banks & Unit Protections, a) Carrying out Load Flow Studies for sizing of Capacitor banks and identifying their locations b) Working out Unit Protection Settings for HT and LT motors. |
| 7.0 |
JINDAL STEEL & POWER LTD., Raigarh
|
Relay Setting and Relay Co-ordination study for RUBM plant and 148” Plate Mill plant electrical distribution system. This includes, a) Short Circuit Study. b) Relay Co-ordination study. c) Working out Unit Protection Settings. |
| 6.0 |
JINDAL STEEL & POWER LTD., Raigarh |
Study of dynamic switching of HT Motors. |
| 5.0 |
JINDAL STEEL & POWER LTD., Raigarh
|
Feasibility Study of Power evacuation from 4 x 135 MW Captive Power Plant at Dongamohua, Tamnar, Dist : Raigarh. This includes,
a)
Feasibility Study for evacuation
of power from 4 x 135 MW Captive Power b) Load flow study & Short circuit study for Option-1, i.e. for 4 x 135 MW CPP to JPL 220 kV switchyard and JPL 220 kV switchyard to JSPL new 220 kV switchyard. c) Load flow study & Short circuit study for Option-2, i.e. for 4 x 135 MW CPP to new 220 kV switchyard at JPSL. |
| 4.0 |
CAIRNS ENERGY INDIA
PTY LIMITED, SURAT |
Restricted Neutral Earthing study. This includes, a) Design the Grounding arrangement for 415Vsystem.
b) Review of existing electrical equipment
in the electrical system for satisfactory
c) Define the design parameters and detailed
technical specifications for Neutral
d) Design of protective relaying system with
specification of equipment such as e) Relay Setting and Relay Co-ordination for existing protective relays. |
| 3.0 |
CHEMAF S.P.R.L., (Republic
of Congo), Africa |
Feasibility study of Load Flow, Short Circuit and Relay Co-ordination of existing Plant electrical distribution system and upgrading the same with upcoming new requirements / projects. |
| 2.0 |
Jindal Steel and Power Ltd. Raigarh, Chattisgarh |
Power System Study for the electrical system including : a. Load flow study b. Short circuit study c. Transient stability study in case of i. Tripping of 220kV incoming CSEB lines at JSPL. ii. Tripping of 250MW TG set at JPL. d. Engineering an islanding scheme. e. Engineering a load shedding scheme under following conditions i. Tripping of 220kV CSEB lines at JSPL. ii. Tripping of 250MW set at JPL. f. Working out the settings for islanding relays and the load shedding blocks, for following conditions, i. Tripping of 220kV CSEB lines at JSPL. ii. Tripping of 250MW set at JPL. g. Working out over current and earth fault relay settings for, i. 220kV line from JPL to OPJIP. ii. 220kV line from OPJIP to JSPL.
iii. 220kV
interconnection, i.e. power evacuation route from receipt of JPL iv. JSPL TG sets power evacuation route up to 220kV bus. h. Working out voltage and frequency relay settings for following, i. 220kV line from JPL to OPJIP. ii. 220kV line from OPJIP to JSPL.
iii. 220kV
interconnection, i.e. power evacuation route from receipt of JPL iv. JSPL TG sets power evacuation route up to 220kV bus. |
| 1.0 |
Jindal Stainless Ltd. Jajpur, Orissa
|
Power System Study for the electrical system including :
a. Prepare and submit key single line diagram (220 kV) relevant to the
protection
i. Augmentation of existing yard keeping the 220 kV switchyard at the
original ii. Construction of new 220 kV switchyard at suitable location.
b. Carry
out the load flow study to identify the basic rating of the equipments and
to c. Work out Voltage & Frequency profile at load centers for the two options under i. Steady state condition & ii. Dynamic condition of the load.
d.
Carry out Short circuit study for three phase faults and phase to
earth faults for the e. Define basic rating of the major equipments such as : i. Transformers ii. Cables
f. Examine
suitability of equipments already in service from view point of current
g. Stability studies to be carried out for following conditions: i. Load flow studies for different grid and captive generators operating conditions.
ii. The effect of dynamic loads of SAF, EAF and rolling mills on the grid
and Captive
iii. The
operations of the plant with / without GRID and with different numbers of
h. Carrying
out following power system studies to develop the application of Grid i. Transient stability study.
ii. Study
to evaluate critical clearance time for fault at 220 kV Gridco Bus, 33 kV
i.
Engineer a Grid islanding scheme for isolating the in-house Captive
Power Plant
j.
Engineer a Load Shedding Scheme, to ensure the survival of CPP on
survived
k. Prepare
and submit, purchase specification for GIS and LSS panel. Assist JSL in
l. Review of vendor drawings for GIS and LSS panel
m. Relay setting for GIS
and LSS scheme relays and relay setting and co-ordination |